Solid timber construction requires different planning and different procurement
Timber construction is changing noticeably. Small and medium-sized carpentry firms are now also taking on projects that were previously the preserve of large general contractors: multi-storey buildings, public buildings, larger tenders.
Many of these companies come from the classic timber frame construction sector. Workflows, partners and purchasing processes are well established for this construction method. However, as soon as Cross laminated timber (CLT) comes into play, these structures often no longer work. Planning, work preparation and procurement need to be rethought.
This is precisely where the cooperation between easy as timber and Mass Timber Solutions which we will present on the Roof & Wood 2026 in Cologne together for the first time.
The challenge in solid timber construction: more complexity, higher requirements
Multi-storey timber construction has different requirements than timber frame construction:
- Significantly higher planning density
- Early definition of details
- Close integration of statics, building physics and fire protection
- Material-intensive components with long supply chains
Many companies reach their internal limits here. Either there is a lack of specialized engineering planning for CLT systems or the purchasing department is designed for smaller, flexible timber construction deliveries - not for large-format solid timber components.
At the same time, trade businesses do not want to switch to anonymous large providers. Personal contacts, short distances and practical support remain crucial.
Systematized planning meets digital procurement
timberleicht and MTS are combining their strengths to make solid timber construction economical and manageable for medium-sized companies.
Engineering planning specifically for CLT
easy as timber takes over the complete engineering planning:
- Structural design
- Building physics
- Fire protection
The focus is consistently on timber and solid wood systems. Planning is geared towards Cross laminated timber constructions coordinated.
Work preparation and material procurement from a single source
MTS supplements the planning:
- Expert advice on material and supplier selection
- Work preparation for joinery
- Digital ordering processes via a central platform
MTS bundles the purchase from the manufacturers. This means that even smaller companies benefit from better conditions without having to forego personal support.
Continuous processes without loss of information
Planning data from timberleicht flows directly into work preparation and procurement at MTS. This ensures:
- Clear interfaces
- Clean calculation
- Reliable delivery dates
The result: an end-to-end project process - from the quotation phase to planning and delivery of the components to the construction site.
Advantages for MTS customers
If you already purchase material via MTS, you can add the appropriate engineering planning directly. Planning and work preparation interlock - without additional coordination rounds.
Advantages for timberleicht customers
Anyone planning with timberleicht can integrate work preparation and material procurement directly via MTS. One complete process step less, more security in the project.
Experience live: Roof & Wood 2026 in Cologne
We talk to you about specific projects, tenders and the economical use of cross laminated timber.
Date: February 24-27, 2026
Note: On February 25 is timberleicht personally at the stand
Location: Cologne Trade Fair
Stand: Hall 7, Stand 118
(MTS - Mass Timber Solutions)


